How to Structure Legally Sound Procurement Contracts in Contracting in Bahrain

How to Structure Legally Sound Procurement Contracts in Contracting in Bahrain


In Bahrain’s contracting industry, procurement contracts form the backbone of supply chain management covering the purchase of materials, equipment, and services necessary to complete construction projects. Poorly structured procurement agreements can lead to cost overruns, delays, quality disputes, and legal liability.

This blog outlines the essential elements of legally sound procurement contracts, the relevant legal framework in Bahrain, and best practices to ensure your procurement arrangements protect both timelines and budgets.

 

 The Role of Procurement Contracts in Contracting

Procurement contracts ensure that:

  • Materials meet project specifications and regulatory standards.
  • Deliveries are made on time to align with the construction schedule.
  • Price and payment terms are fixed or clearly defined to prevent disputes.
  • The contractor has legal recourse if suppliers fail to deliver as agreed.

 

Legal Framework in Bahrain

Procurement agreements in Bahrain are governed by:

  • Bahraini Civil Code — regulating contractual obligations and remedies.
  • Commercial Law — covering commercial transactions and trade practices.
  • Sector-Specific Regulations — including building codes, safety standards, and environmental laws for certain materials or products.

Where public projects are involved, procurement must also comply with Bahrain Tender Board regulations.

 

 Key Elements of a Legally Sound Procurement Contract

  1. Clear Identification of Parties
    • Include full legal names, CR numbers, and contact details of both buyer and supplier.
  2. Detailed Specifications
    • Provide precise descriptions, technical standards, and quality requirements for goods or services.
  3. Delivery Terms
    • State delivery dates, locations, and responsibility for transportation and insurance.
    • Use Incoterms if importing goods.
  4. Pricing and Payment
    • Specify whether prices are fixed, adjustable, or subject to currency fluctuations.
    • Define payment schedules, methods, and penalties for late payment.
  5. Inspection and Acceptance
    • Include procedures for inspecting goods and rejecting non-compliant deliveries.
  6. Warranties and Guarantees
    • Require suppliers to warrant that materials meet contractual and legal standards.
  7. Remedies for Breach
    • Outline the buyer’s right to claim damages, demand replacements, or terminate the contract.
  8. Dispute Resolution
    • Specify governing law (Bahrain) and dispute resolution methods, such as arbitration or mediation.

 

Risks of Poorly Drafted Procurement Contracts

  • Receiving substandard materials with no recourse for replacement.
  • Project delays due to late deliveries or unclear timelines.
  • Cost escalations from undefined or fluctuating prices.
  • Legal disputes over unclear terms or missing clauses.

 

 Example:

A contractor in Bahrain procured imported marble for a luxury hotel project. The procurement contract simply stated “Italian marble” without specifying grade, thickness, or finish. Upon delivery, the marble was of a lower grade than expected.

The supplier argued that the goods met the contract description, and because the specifications were vague, the contractor could not enforce a replacement. A lawyer reviewing the case concluded that precise technical specifications in the procurement contract could have avoided the dispute entirely.

 

Best Practices

For Contractors:

  • Always include detailed specifications and testing requirements.
  • Align delivery timelines with the project schedule.
  • Require warranties and guarantees for all supplied materials.
  • Use back-to-back terms so supplier obligations match the main contract requirements.

For Employers:

  • Ensure contractors source from pre-approved suppliers with proven compliance.
  • Monitor procurement documentation for quality and legal compliance.
  • Insist on clear remedies for late or defective deliveries.